※Wastewater: according to the classification of the “ordinances stipulated under the emission standards based on the Air Pollution Control Act and the waste water standards based on the Water Pollution Control Act (Prefectural Ordinance 18)”
※Concluded land subdivisions (leased) include tentative sale of lots or lots under negotiation.
Location | Fukushima City |
---|---|
Current condition | FY2023 Site preparation to commence |
Zoning | Industrial (district planning) planning |
Lot price | - |
Regional designation | - |
Land category | Housing |
Total area | Factory site | Subdivided area | Available lot area | |
---|---|---|---|---|
Area[ha] | 19.5 | 16.0 | 0 | 16.0 |
Land category | Housing |
Preferential treatment system |
|
---|---|
Subdivision lot sales | Available(upon consultation) |
Rentals | No |
Other | Tohoku Chuo Expressway 0 km to the Fukushima Ozaso IC (Direct connection to IC) |
Industrial water | Waterworks | Groundwater | |
---|---|---|---|
Water[m3/day] | - | ○ | - |
Wastewater | Abukuma River, water area A after single treatment |
Standard high voltage | ○ |
---|---|
Extra high voltage | - |
Optical communication network | - |
N value | - |
---|
INDEXList of industrial parks
01Northern region
02Central region
03Southern region
04Aizu region
05Soso and Iwaki regions