ページの先頭です

ページ内を移動するためのリンク
本文(c)へ
グローバルナビゲーション(g)へ
ローカルナビ(l)へ
サイトのご利用案内(i)へ

ここからグローバルナビです。

グローバルメニューここまでです。

Doyama Business Park

  • Lots for sale
  • Lots sold (tentative)
  • Green areas
  • Regulating pond
  • In use with temporary construction or similar, sale on hold

Located in the southern part of the Nakadori region in Fukushima Prefecture, this business park has favorable access to the high-speed transportation network, being 3.6km to National Route 4, 4.4km to Tohoku Expressway Yabuki IC, 6.5km to JR Tohoku Main Line Yabuki Station, 14km to JR Tohoku Shinkansen Shirakawa Station, and 14km to Fukushima Airport. The business park is within a commutable distance from nearby municipalities, so businesses in the park can rest assured that they will be able to find a workforce relatively easily.

Basic information

Location Shimogawara,Taishin masumi,Shirakawa city
Operator Shirakawa City
Current condition Construction completed
Lot sale price undecided (To be announced after decision)
Zone designation Industrial
Designation of purpose under the City Planning Act Blank
Building coverage ratio/Floor area ratio 60/200(%)

Area for industrial use

Industrial park total areaIndustrial landArea of lots soldArea available for lots
Area [ha] 2.1 1.7 1.2 0.4
Land classification

Lot for sale

No.Total areaFlat ground area [ha]Slope area [ha]Notices
[m2][ha]
2 2,604 0.3
3 1,455 0.1

Incentive system

subsidy/grant
  1. Tsunami & nuclear disaster area employment creation business siting subsidy
    Grant rate up to 1/3 (large businesses, up to 1/4)
  2. Fukushima industrial recovery investment promotion zone
  3. Shirakawa City siting incentives, Shirakawa City employment promotion incentives
  4. Shirakawa City environmental improvement incentives, Shirakawa City residential acquisition incentives
Loan
Preferred business types
Logistics company accepted/not accepted Y
Lot division possible N
Other

Water usage

development of waterPublic waterGround water
Total volume [m3/day] 50
Residual quantity [m3/day] 50
price [yrn/m3] 130
Waste water After simple processing, Kumado River (Abukumagawa River System)

Power / Fiber-optic network

Regular voltage Yabuki substation 3.3km Nabesawa power cable: 2.0km (margin) 200kw
Extra-high voltage Yabuki substation 3.3km Suhaku power cable: 3.3km (margin) 6,800kw
Fiber-optic network

Geological ground

Geological ground N value: 50
Ground for piling: 7m deep

Access

Route 3.6km or 6minutes to the National Highway 4
Expressways 4.4km or 7minutes to the Yabuki IC, Tohoku Expressway
Trains 6.5km or 11minutes to the Yabuki station, Tohoku Honsen
Shinkansen 13km or 25minutes to the Shin Shirakawa station, Tohoku Shinkansen
Airport 14km or 30minutes to the Fukushima Airport
Port 75km or 120minutes to the Onahama Port

ローカルナビここまでです。

ここからサイトのご利用案内です。

Back to top

サイトのご利用案内ここまでです。