Overview of Factory Setup Low/Act
Specific factory application system based on factory setup law
The factory which is applicable to the following requirements should submit an application based on the factory setup law.
1) Application form of new construction (change) of specific factory
Factory Establishment or change report(Word Documents : 229KB : Japanese only)
Attached form(Word Documents : 175KB : Japanese only)
| Target of application | If a factory whose site area is 9,000 m2 or more or whose construction area is 3,000 m2 is newly constructed or changed |
|---|---|
| Target of application of change |
|
| Contents of restriction |
|
| Timing of application | 90 days before construction starts (An application in shorter term may be accepted.) |
| Submit to | Setup Group of Labor Department of Fukushima Prefecture |
| No. of copies of application | One copy |
2) Application form of name change of specific factory (name/address)
Application form (change name/address)(Word Documents : 21KB : Japanese only)
| Target of application | If the name, corporate name or address of the one who submitted an application of new construction (change) of specific factory is changed |
|---|---|
| Contents of application | * Change of corporate name * Change of head office address * (Note) Not applicable when only the representative executive name is changed |
| Timing of application | Without delay |
| Submit to | Setup Group of Labor Department of Fukushima Prefecture |
| No. of copies of application | One copy |
3) Application of inheritance of specific factory
Application form(Word Documents : 22KB : Japanese only)
| Target of application | If the position of the one who submitted an application of new construction of specific factory is inherited |
|---|---|
| Contents of application | * Transferee/assignee of specific factory of application * Inheritor of the one who made an application * Corporate body which continues to exist after merge or corporate body established after merge if the one who made an application is merged |
| Timing of application | Without delay |
| Submit to | Setup Group of Labor Department of Fukushima Prefecture |
| No. of copies of application | One copy |
Factory setup application system based on industry development act of Fukushima Prefecture
The factory which is applicable to the following requirements should submit an application based on the factory setup law.
1) Application of new construction (expansion) of factory
Application form(Word Documents : 382KB : Japanese only)
| Target of application | If a factory whose site area is 1,000 m2 or more is newly constructed/changed* If the site area exceeds 9,000 m2 or the construction area exceeds 3,000 m2, both an application of specific factory and an application of factory setup are required. |
|---|---|
| Target of application of change |
|
| Contents of restriction |
|
| Timing of application | 90 days before construction starts |
| Submit to | City or village |
| No. of copies of application | 3 copies (one original, two copies) |
2) Application of production activation of factory
Application form(Word Documents : 41KB : Japanese only)
| Target of application | When the operation of the factory begins |
|---|---|
| Timing of application | Without delay |
| Submit to | City or village |
| No. of copies of application | 3 copies (one original, two copies) |