The factory which is applicable to the following requirements should submit an application based on the factory setup law.
Factory Establishment or change report(Word Documents : 229KB : Japanese only)
Attached form(Word Documents : 175KB : Japanese only)
| Target of application | If a factory whose site area is 9,000 m2 or more or whose construction area is 3,000 m2 is newly constructed or changed |
|---|---|
| Target of application of change |
|
| Contents of restriction |
|
| Timing of application | 90 days before construction starts (An application in shorter term may be accepted.) |
| Submit to | Setup Group of Labor Department of Fukushima Prefecture |
| No. of copies of application | One copy |
Application form (change name/address)(Word Documents : 21KB : Japanese only)
| Target of application | If the name, corporate name or address of the one who submitted an application of new construction (change) of specific factory is changed |
|---|---|
| Contents of application | * Change of corporate name * Change of head office address * (Note) Not applicable when only the representative executive name is changed |
| Timing of application | Without delay |
| Submit to | Setup Group of Labor Department of Fukushima Prefecture |
| No. of copies of application | One copy |
Application form(Word Documents : 22KB : Japanese only)
| Target of application | If the position of the one who submitted an application of new construction of specific factory is inherited |
|---|---|
| Contents of application | * Transferee/assignee of specific factory of application * Inheritor of the one who made an application * Corporate body which continues to exist after merge or corporate body established after merge if the one who made an application is merged |
| Timing of application | Without delay |
| Submit to | Setup Group of Labor Department of Fukushima Prefecture |
| No. of copies of application | One copy |
The factory which is applicable to the following requirements should submit an application based on the factory setup law.
Application form(Word Documents : 382KB : Japanese only)
| Target of application | If a factory whose site area is 1,000 m2 or more is newly constructed/changed* If the site area exceeds 9,000 m2 or the construction area exceeds 3,000 m2, both an application of specific factory and an application of factory setup are required. |
|---|---|
| Target of application of change |
|
| Contents of restriction |
|
| Timing of application | 90 days before construction starts |
| Submit to | City or village |
| No. of copies of application | 3 copies (one original, two copies) |
Application form(Word Documents : 41KB : Japanese only)
| Target of application | When the operation of the factory begins |
|---|---|
| Timing of application | Without delay |
| Submit to | City or village |
| No. of copies of application | 3 copies (one original, two copies) |